| Consignee | Address & Destination | Quantity | Delivery Timeframe |
|---|---|---|---|
| Designated Consignee | Raigad | 440 Units | 180 calendar days |
| Designated Consignee | Raigad | 510 Units | 180 calendar days |
Mirror Panelling,Rafter Panelling,Illumination fixture
Analyzed 20 previously awarded contracts in this department & category to guide your bidding quote.
Average winning rate across 20 past evaluated bids
Most aggressive winning quote on record for this authority
Won 2 contracts with this buyer
| Tender Ref No | Buyer / Authority | Winning Vendor (L1) | Award Date | Winning L1 Quote | Action |
|---|---|---|---|---|---|
| GEM/2026/R/633163 | Department of Military Affairs | SSA ENTERPRISES | 27 Oct 2026, 10:08 PM IST | ₹ 38.09 Lakhs | View Sheet |
| GEM/2026/B/8165011 | Department of Military Affairs | MUNISH ENTERPRISES | 27 Oct 2026, 09:23 PM IST | ₹ 2.91 Lakhs | View Sheet |
| GEM/2026/R/628001 | Department of Military Affairs | DEEPAK ENTERPRISE | 27 Oct 2026, 08:47 PM IST | ₹ 60,984 | View Sheet |
| GEM/2026/R/632392 | Department of Military Affairs | GURU TRADERS AND CONSTRUCTIONS | 27 Oct 2026, 08:16 PM IST | ₹ 9.88 Lakhs | View Sheet |
| GEM/2026/R/645104 | Department of Military Affairs | HAYYAN MACHINERY MERCHANTS | 27 Oct 2026, 08:07 PM IST | ₹ 2.3 Lakhs | View Sheet |
| GEM/2026/R/671584 | Department of Military Affairs | SHUBHAM ENTERPRISE | 27 Oct 2026, 07:54 PM IST | ₹ 17.34 Lakhs | View Sheet |
Generate official statutory declarations on company letterhead or ₹100 stamp paper ready for DSC signing and GeM upload.
Mirror Panelling,Rafter Panelling,Illumination fixture
Deep-parsed legal requirements, credentials, financial criteria & compliance clauses
(cid:75)(cid:75)ेेतताा (cid:79)(cid:79)ाारराा जजोोड़ड़(cid:19)(cid:19) गगईई (cid:1)(cid:1)बबडड कक(cid:16)(cid:16) (cid:1)(cid:1)ववशशेषेष शशतत(cid:112)(cid:112)
Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
Bidders can also submit the EMD with Account Payee Demand Draft in favour of The Chief General Manager payable at At Mumbai . Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.
Bidder shall submit the following documents along with their bid for Vendor Code Creation: a. Copy of PAN Card. b. Copy of GSTIN. c. Copy of Cancelled Cheque. d. Copy of EFT Mandate duly certified by Bank.
While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 3 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of The Chief General Manager A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Successful Bidder has to upload scanned copy of the FDR document in place of PBG and has to ensure delivery of hard copy of Original FDR to the Buyer within 15 days of award of contract.
OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the OEM is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. In case of bunch bids, the OEM of CATEGORY RELATED TO primary product having highest bid value should meet this criterion.
NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement.
Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller.
Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.
Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid. /Disclaimer अअ(cid:39)(cid:39)ववीीककररणण