360
You’re viewing a limited version of this tender
The real GeM bid number, buyer contact details, official documents, BOQ and the AI bid tools are available on the free plan.
| Consignee | Address & Destination | Quantity | Delivery Timeframe |
|---|---|---|---|
| RANCHI | / | 1 Units | 30 calendar days |
Bimetal Band Saw Blade
Analyzed 20 previously awarded contracts in this department & category to guide your bidding quote.
Average winning rate across 20 past evaluated bids
Most aggressive winning quote on record for this authority
Won 1 contract with this buyer
| Tender Ref No | Buyer / Authority | Winning Vendor (L1) | Award Date | Winning L1 Quote | Action |
|---|---|---|---|---|---|
| GEM/2025/R/599221 | Department of Heavy Industry | SHREE BALAJI INDUSTRIES | 25 Oct 2026, 02:24 AM IST | ₹ 5.45 Lakhs | View Sheet |
| GEM/2025/R/598651 | Department of Heavy Industry | M/S MAHENDRA ELECTRIC ENGINEERING WORKS | 25 Oct 2026, 02:24 AM IST | ₹ 54.32 Lakhs | View Sheet |
| GEM/2025/R/599246 | Department of Heavy Industry | Coolking Servicing | 25 Oct 2026, 02:24 AM IST | ₹ 71,864.41 | View Sheet |
| GEM/2025/R/599174 | Department of Heavy Industry | VVDN TECHNOLOGIES PRIVATE LIMITED | 25 Oct 2026, 02:24 AM IST | ₹ 2.05 Cr | View Sheet |
| GEM/2025/R/598808 | Department of Heavy Industry | black belt paints | 25 Oct 2026, 02:24 AM IST | ₹ 3.66 Lakhs | View Sheet |
| GEM/2025/R/599075 | Department of Heavy Industry | INGENIOUS CONSULTANTS SERVICES (POWER AND TRANSPORTATION)P. LTD | 25 Oct 2026, 02:24 AM IST | ₹ 2 Lakhs | View Sheet |
Generate official statutory declarations on company letterhead or ₹100 stamp paper ready for DSC signing and GeM upload.
Bimetal Band Saw Blade
Deep-parsed legal requirements, credentials, financial criteria & compliance clauses
(cid:74)(cid:74)ेेतताा (cid:78)(cid:78)ाारराा जजोोड़ड़(cid:19)(cid:19) गगईई (cid:1)(cid:1)बबडड कक(cid:16)(cid:16) (cid:1)(cid:1)ववशशेषेष शशतत(cid:108)(cid:108)
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address Custodt Store Incharge Foundry Forge Plant Heavy Engineering Corporation Limited Plant Plaza Road Ranchi-834004, Jharkhand .
Bidder shall submit the following documents along with their bid for Vendor Code Creation: a. Copy of PAN Card. b. Copy of GSTIN. c. Copy of Cancelled Cheque. d. Copy of EFT Mandate duly certified by Bank.
Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.
For hazardous chemical/item, all precautionary measure as per regulation from the point of transportation/ handling/ storage/ safety/ health/ environment to be undertaken/ specified before dispatch. During dispatch, proper symbol for the hazard/ MSDS/ Batch No./ date of manufacturing/ Gross Weight/ Net Weight/ shelf Life etc are to be written/ printed/ pasted on the body of the packing.
Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum 12 months Shelf Life. On the date of supply, minimum 12 months usable shelf life should be available / balance.
Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only.
buyer.
written consent of buyer.
liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and the Sellers obligations there under.
Scope of supply (Bid price to include all cost components) : Only supply of Goods
Purchase Preference linked with Local Content (PP-LC) Policy: The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for false / wrong declaration or not fulfilling the Local Content requirement shall be as per the PPLC policy. Further following additional provisions are added in the certification and verification of local content provision of the Preference to Make in India clause: i. In case of foreign bidder, certificate from the statutory auditor or cost auditor of their own office or subsidiary in India giving the percentage of local content is also acceptable. In case office or subsidiary in India does not exist or Indian office/subsidiary is not required to appoint statutory auditor or cost auditor, certificate from practicing cost accountant or practicing chartered accountant giving the percentage of local content is also acceptable. ii. Along with Each Invoice: The local content certificate (issued by statutory auditor on behalf of procuring company) shall be submitted along with each invoice raised. However, the % of local content may vary with each invoice while maintaining the overall % of local content for the total work/purchase of the pro-rata local content requirement. In case, it is not satisfied cumulatively in the invoices raised up to that stage, the supplier shall indicate how the local content requirement would be met in the subsequent stages. iii. The bidder shall submit an undertaking from the authorized signatory of bidder having the Power of Attorney along with the bid stating the bidder meets the mandatory minimum LC requirement and such undertaking shall become a part of the contract.
Purchase Preference linked with Local Content (PP-LC) Policy: The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for false / wrong declaration or not fulfilling the Local Content requirement shall be as per the PPLC policy. Further following additional provisions are added in the certification and verification of local content provision of the Preference to Make in India clause: i. In case of foreign bidder, certificate from the statutory auditor or cost auditor of their own office or subsidiary in India giving the percentage of local content is also acceptable. In case office or subsidiary in India does not exist or Indian office/subsidiary is not required to appoint statutory auditor or cost auditor, certificate from practicing cost accountant or practicing chartered accountant giving the percentage of local content is also acceptable. ii. Along with Each Invoice: The local content certificate (issued by statutory auditor on behalf of procuring company) shall be submitted along with each invoice raised. However, the % of local content may vary with each invoice while maintaining the overall % of local content for the total work/purchase of the pro-rata local content requirement. In case, it is not satisfied cumulatively in the invoices raised up to that stage, the supplier shall indicate how the local content requirement would be met in the subsequent stages. iii. The bidder shall submit an undertaking from the authorized signatory of bidder having the Power of Attorney along with the bid stating the bidder meets the mandatory minimum LC requirement and such undertaking shall become a part of the contract.
Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM must have Dedicated/toll Free Telephone No. for Service Support.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document.
Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of Heavy Engineering Corporation Limited payable at Ranchi . After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract.
Buyer uploaded ATC document Click here to view the file. /Disclaimer अअ(cid:39)(cid:39)ववीीककररणण
Notices, technical specs, BOQ & buyer annexures
Open tenders in Bimetal Band Saw Blade. Save the search for new ones by email.
Browse similar tenders