360
You’re viewing a limited version of this tender
The real GeM bid number, buyer contact details, official documents, BOQ and the AI bid tools are available on the free plan.
| Consignee | Address & Destination | Quantity | Delivery Timeframe |
|---|---|---|---|
| Depot, Poonamallee High Road, | Koyambedu Dead Man Switch Assembly ततककननीीकक(cid:16)(cid:16) (cid:1)(cid:1)ववििशश(cid:1)(cid:1)(cid:88)(cid:88)ययााँ ँ /Technical Specifications Specification Document View File BOQ Detail Document View File Advisory-Please refer attached BOQ document for detailed consignee list and delivery period. | 1 Units | 30 calendar days |
Procurement of Master Controller Spares for POH of Rolling Stock
Analyzed 13 previously awarded contracts in this department & category to guide your bidding quote.
Average winning rate across 13 past evaluated bids
Most aggressive winning quote on record for this authority
Won 1 contract with this buyer
| Tender Ref No | Buyer / Authority | Winning Vendor (L1) | Award Date | Winning L1 Quote | Action |
|---|---|---|---|---|---|
| GEM/2026/B/7528162 | Chennai Metro Rail Ltd | SIVANANDA ELECTRONICS INDIA PRIVATE LIMITED | 29 Oct 2026, 06:37 PM IST | ₹ 9.15 Lakhs | View Sheet |
| GEM/2026/B/7615897 | Chennai Metro Rail Ltd | THE INDIA THERMIT CORPORATION LIMITED | 29 Oct 2026, 06:23 PM IST | ₹ 6.13 Lakhs | View Sheet |
| GEM/2026/B/7609479 | Chennai Metro Rail Ltd | LAMCO INDUSTRIES PRIVATE LIMITED | 29 Oct 2026, 06:15 PM IST | ₹ 7.55 Lakhs | View Sheet |
| GEM/2026/B/7653481 | Chennai Metro Rail Ltd | Dinu Technology | 29 Oct 2026, 03:22 PM IST | ₹ 24.2 Lakhs | View Sheet |
| GEM/2026/B/7606796 | Chennai Metro Rail Ltd | ALSTOM TRANSPORT INDIA LIMITED | 29 Oct 2026, 01:52 PM IST | ₹ 3.05 Cr | View Sheet |
| GEM/2026/B/7681767 | Chennai Metro Rail Ltd | PALLADIUM SAFETY SOLUTIONS PRIVATE LIMITED | 29 Oct 2026, 11:09 AM IST | ₹ 1.49 Lakhs | View Sheet |
Generate official statutory declarations on company letterhead or ₹100 stamp paper ready for DSC signing and GeM upload.
Procurement of Master Controller Spares for POH of Rolling Stock
Deep-parsed legal requirements, credentials, financial criteria & compliance clauses
(cid:71)(cid:71)ेेतताा (cid:74)(cid:74)ाारराा जजोोड़ड़(cid:19)(cid:19) गगईई (cid:1)(cid:1)बबडड कक(cid:16)(cid:16) (cid:1)(cid:1)ववशशेषेष शशतत(cid:106)(cid:106)
Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address Mr. Bharath – Manager (RS) RS Stores, Rolling Stock Department, Chennai Metro Rail Limited CMRL Depot, Poonamallee High Road, Koyambedu – 600107 Email: - bharath.c@cmrl.in , rsprocure@cmrl.in Contact – 9710561046, 9150043355 .
Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid.
Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.
Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection.
Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid
OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity up to 25% of the contracted quantity during the currency of the contract at the contracted rates. The delivery period of quantity shall commence from the last date of original delivery order and in cases where option clause is exercised during the extended delivery period the additional time shall commence from the last date of extended delivery period. The additional delivery time shall be (Increased quantity ÷ Original quantity) × Original delivery period (in days), subject to minimum of 30 days. If the original delivery period is less than 30 days, the additional time equals the original delivery period. The Purchaser may extend this calculated delivery duration up to the original delivery period while exercising the option clause. Bidders must comply with these terms.
OPTIONAL SITE VISIT:
on its own responsibility all information that may be necessary for preparing the Bid. The costs of visiting the site shall be borne by the Bidder. YES
the express conditions that the Bidder will release and indemnify the Buyer and Consignee against all liabilities arising out of such visit including death or injury, loss or damage to property, and any other loss, damage, costs, and expenses incurred as a result of such visit.
kind of pre-requisite information as it is the sole responsibility of the Bidder to obtain all the necessary information with regard to site, surrounding, working conditions, weather etc. on its own before submission of the bid.
Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only.
The Buyer has an existing set up / inventory of similar products. The offered / supplied product must be compatible with existing system. The bidder has to ensure Compatibility of the supplied items or shall have to include in the supply the necessary hardware / software to make them compatible at no extra cost to the buyer. The details of items with which compatibility is required are as under: Scope of work from the CMRL
The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: YES .
Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if: i) The Seller fails to comply with any material term of the Contract. ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent. iii) The Seller fails to deliver the Material(s) or any part thereof within the stipulated Delivery Period and/or to replace/rectify any rejected or defective Material(s) promptly. iv) The Seller becomes bankrupt or goes into liquidation. v) The Seller makes a general assignment for the benefit of creditors. vi) A receiver is appointed for any substantial property owned by the Seller. vii) The Seller has misrepresented to Buyer, acting on which misrepresentation Buyer has placed the Purchase Order on the Seller.
Scope of supply (Bid price to include all cost components) : Only supply of Goods
Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporation of the bidder is less than 3 year old, the average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria.
IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted.
Bidder's offer is liable to be rejected if they don't upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item.
Warranty period of the supplied products shall be 1 years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in INDIA for attending the after sales service. Details of Service Centres near consignee destinations are to be uploaded along with the bid.
Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope Minimum 12 months warranty / guarantee from the date of acceptance by CMRL should be given in the for m of certificate indicating the warranty period along with the terms & conditions for the warranty / guarant ee and Additional warranty/extended warranty period offered by OEM/Contractor shall be given to CMRL in Warranty Certificate. (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking)
Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid.
Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 15 days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shall have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer.
After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit 5 samples for Buyer's approval, within 15 days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within 15 days of receipt of advance sample. Seller shall be required to ensure supply as per approved sample with modifications as communicated by Buyer. If there is delay from buyer side in approval of advance sample – the delivery period shall be refixed without LD for the period of delay in sample approval. In case, the sample is found to have major deviations / not conforming to the Contract specifications, the buyer at its discretion may call for fresh samples for approval before allowing bulk supplies or may terminate the contract after notifying the deviations to the seller. Unless otherwise provided in the contract, all samples required for test shall be supplied by the contractor free of cost. Where under the contract, the contractor is required to submit an advance sample, any expenses incurred by the contractor on or in connection with the production of stores in bulk, before the sample has been approved unconditionally shall be borne by the Seller and he shall not claim any compensation in the event of such sample being found unacceptable by the Buyer / Consignee.
Bidders can also submit the EMD with Payment online through RTGS / internet banking in Beneficiary name CHENNAI METRO RAIL LIMITED Account No. 0416214000030 IFSC Code CNRB0000416 Bank Name Canara Bank Branch address Teynampet Branch, Chennai-600 018 . Bidder to indicate bid number and name of bidding entity in the transaction details field at the time of on- line transfer. Bidder has to upload scanned copy / proof of the Online Payment Transfer along with bid.
Successful Bidder can submit the Performance Security in the form of Payment online through RTGS / internet banking also (besides PBG which is allowed as per GeM GTC). On-line payment shall be in Beneficiary name CHENNAI METRO RAIL LIMITED Account No. 0416214000030 IFSC Code CNRB0000416 Bank Name Canara Bank Branch address Teynampet Branch, Chennai-600 018 . Successful Bidder to indicate Contract number and name of Seller entity in the transaction details field at the time of on-line transfer. Bidder has to upload scanned copy / proof of the Online Payment Transfer in place of PBG within 15 days of award of contract.
Buyer uploaded ATC document Click here to view the file. /Disclaimer अअ(cid:39)(cid:39)ववीीककररणण
Notices, technical specs, BOQ & buyer annexures
Open tenders in Snap Action Switch Power or Brake Control,Dead Man Switch Assembly,Snap Action Switch Reverser Swit. Save the search for new ones by email.
Browse similar tenders